French aircraft carrier Charles De Gaulle

Matzos

French aircraft carrier Charles De Gaulle

Extended Description
The 38,000t, nuclear-powered aircraft carrier Charles De Gaulle was constructed at the DCN Brest naval shipyard in Brittany. The ship was launched in May 1994 and commissioned in September 2000, following sea trials which began in January 1999

The ship can operate a fleet of up to 40 aircraft: Rafale M (range 3,340km), Super Etendard (range 1,682km) and three E-2C Hawkeye airborne early warning aircraft. The ship will also support the AS 565 Panther or NH 90 helicopter.

The main deck consists of a main runway angled at 8.5 to the ship's axis and an aircraft launch area forward of the island. These are each equipped with a USN Type C13 catapult, capable of launching one aircraft per minute. The runway is 195m long and the whole deck measures 260 x 64m.

The French nuclear carrier "Charles de Gaulle" has suffered from a seemingly endless string of problems since it was first conceived in 1986. The 40,000 ton ship has cost over four billion dollars so far and is slower than the steam powered carrier it replaced. Flaws in the "de Gaulle" have led it to using the propellers from it predecessor, the "Foch," because the ones built for "de Gaulle" never worked right and the propeller manufacturer went out of business in 1999. Worse, the nuclear reactor installation was done poorly, exposing the engine crew to five times the allowable annual dose of radiation. There were also problems with the design of the deck, making it impossible to operate the E-2 radar aircraft that are essential to defending the ship and controlling offensive operations. Many other key components of the ship did not work correctly, including several key electronic systems. The carrier has been under constant repair and modification. The "de Gaulle" took eleven years to build (1988-99) and was not ready for service until late 2000. It's been downhill ever since. The de Gaulle is undergoing still more repairs and modifications. The government is being sued for exposing crew members to dangerous levels of radiation.

The cause of the problems can be traced to the decision to install nuclear reactors designed for French submarines, instead of spending more money and designing reactors specifically for the carrier. Construction started and stopped several times because to cuts to the defense budget and when construction did resume, there was enormous pressure on the builders to get on with it quickly, and cheaply, before the project was killed. The result was a carrier with a lot of expensive problems.

Excellent pic, Matzos. Also looks as though it could do with a lick of paint, although with all these problems you listed, that's probably the least of their worries! Don't think I'd be a happy French matelot if I was a crew member!
 